HomeOur ExpertiseMarine ConstructionMarine Construction & InstallationFloating Pontoon & Gangway Installation
Marine ConstructionMarine Construction & Installation

Design, Supply & Installation of Floating Pontoons and Gangways

What is Floating Pontoon & Gangway Installation?

KCC provides a complete design, supply, and installation service for floating pontoon systems and associated gangways across Hong Kong. Our pontoon range covers HDPE modular floating pontoons and aluminium frame pontoons, configured to suit marina berths, ferry piers, public landing steps, and private premises. Gangways are designed with appropriate gradient limits for the tidal range of the site and fitted with anti-slip decking and handrails to HKMD and Buildings Department requirements.

Pontoon anchoring systems — pile guide, anchor chain, or spud pile — are designed for the site's tidal range, current, and vessel loading. KCC's commercial divers install all below-waterline anchor points, pile guides, and chain connections. Electrical and water services to pontoons can be incorporated at design stage.

Compliance: All pontoon installations are designed and installed in accordance with Hong Kong Marine Department requirements and, where applicable, Buildings Department approval. Structural design is carried out by a Registered Structural Engineer.

What's Included

  • Pontoon system design — layout, loading, tidal range, and anchoring
  • Supply of HDPE modular and aluminium frame floating pontoons
  • Gangway design and supply with anti-slip decking and handrails
  • Pile guide, anchor chain, and spud pile anchoring systems
  • Diver installation of below-waterline anchor points and pile guides
  • Electrical and water service integration
  • HKMD and Buildings Department submission support
  • Post-installation inspection and commissioning

Why This Matters

A well-designed floating pontoon provides safe, accessible berthing and landing facilities that move with the tide. KCC manages the full project — from design and HKMD submission through to diver installation of the anchoring system — reducing the number of contractors a client needs to manage.

Related Services in Marine Construction & Installation

Part of

Marine Construction

KCC delivers specialist marine construction works across Hong Kong and the region — from seawall rep

View all Marine Construction services
IMCA ADCI HSE HKCP

IMCA · ADCI · HSE · HKCP Compliant

All diving operations conducted to IMCA, ADCI, HSE & HKCP standards

Need Floating Pontoon & Gangway Installation?

Get a fast response from our team in Hong Kong.

Ready to Get Started?

Our team is ready to discuss your project requirements and provide a detailed proposal.