HomeOur ExpertiseMarine ConstructionIntake & Outfall StructuresDosing Pipe Installation
Marine ConstructionIntake & Outfall Structures

Dosing Pipe Installation — Supporting Seawater Pump House Operations

What is Dosing Pipe Installation?

KCC fabricates and installs dosing pipes for seawater pump houses, chemical dosing systems, and marine infrastructure. Dosing pipes are designed to suit the specific operational requirements of the pump house and installed by our dive team as part of a complete marine infrastructure package.

What's Included

  • Review of pump house operational requirements and dosing pipe design
  • Fabrication of dosing pipe sections to required dimensions and material specification
  • Diver-assisted installation and connection of dosing pipes within the culvert or pump house intake
  • Pressure testing of installed pipework to confirm integrity
  • Post-installation inspection and handover documentation

Why This Matters

Dosing pipes are a critical component of seawater pump house systems — ensuring correct chemical dosing for anti-fouling, corrosion inhibition, and water treatment. KCC's in-house fabrication and installation capability ensures dosing pipes are correctly designed and installed for the specific system requirements.

Related Services in Intake & Outfall Structures

Part of

Marine Construction

KCC delivers specialist marine construction works across Hong Kong and the region — from seawall rep

View all Marine Construction services
IMCA ADCI HSE HKCP

IMCA · ADCI · HSE · HKCP Compliant

All diving operations conducted to IMCA, ADCI, HSE & HKCP standards

Need Dosing Pipe Installation?

Get a fast response from our team in Hong Kong.

Ready to Get Started?

Our team is ready to discuss your project requirements and provide a detailed proposal.