
OUR STRENGTHS
Civil Engineering
& Construction
We provide innovative diving services across a variety of specialist projects in the civil engineering field, always with a focus on safety and quality. We have an excellent track record of carrying out a wide range of complex projects to the highest quality.
With a history of bringing innovative methods to our clients’ projects for cost-effective results, we’ve built excellent relationships across the civil engineering industry.

SHIPPING
We provide high-quality, responsive diving services for the shipping industry. We have proven experience in providing class surveys, inspection, impact damage assessments, hull cleaning, propeller clearance and salvage. With a 24-hour call-out service, the highest level of accreditation and a large pool of experienced divers, we can respond quickly and safely to clients in Hong Kong and beyond.
All our dive spreads are equipped with HD camera systems to allow topside observation of diver activities.
We have our own wide range of load-certified lifting bags, a self-propelled crane barge and work boats for specialist lifting and towing. We offer a full range of hull maintenance services including, survey, welding, anode replacement, propeller polishing, cavitation cleaning.

INSPECTIONS
KCC provides subsea inspections to all marine-related sectors, providing accurate, reliable, and methodical inspection data. Utilizing HD CCTV camera systems provides a real-time review and recording of the survey and inspections, providing clients with written, photographic, and video reports.
FEATURED PROJECTS:
Client:
LOCATION:
COMPLETION:
PROJECT:
Culvert Demolition and
Reinstallation Overview
Project Overview
Kowloon Construction provided commercial diving support for the demolition of an existing culvert system using stitch coring and diamond wire cutting, followed by the reinstallation of a 2500-ton precast diversional culvert. Key activities included leveling and grading, heavy lifts, subsea concrete pours, subsea burning, remedial works on pen gates, and desilting with silt curtain launch and recovery.
Key Features
Demolition: Precision cutting using stitch coring
and diamond wire cutting.
Preparation: Grading, Levelling, Survey,
Installation: Reinstallation of a 2500-ton precast culvert.
Additional Works:
Heavy lifts
Subsea concrete pours
Desilting and silt curtain management
Pen gate rectification and maintenance

Client:
LOCATION:
PROJECT:
Cofferdam Installation
Overview
Project Overview
This project involved the installation of cofferdams inside a black water confined holding tank to facilitate safe and efficient access for remedial works.
Key Features
Cofferdam Installation: Creation of a secure working environment within the confined space.
Safety Measures: Compliance with safety regulations for confined space work.
Purpose: To enable maintenance and drainage activities without disrupting operations.